 |
EC Funds
- ESF Project "New smart nanocomposite materials for roads, bridges, buildings and transport vehicles", 2013 – 2015. Project Leader from IPM: J. Andersons.
- ESF Project "Service properties of nanostructured electrically passive polymer Composites", 2013 – 2015. Project Leader:
J. Jansons.
- EC 7th "Next Generation Design Guidelines for Composites in Construction" (TUD COST Action TU1207), 04/04/2013 – 28/05/2013. Project Leader from IPM: V. Tamužs.
- EC 7th "European Network for Durable Reinforcement and Rehabilitation Solutions" (ENDURE). Coordinator from the University of Sheffield (UK), 01/10/2013 – 30/09/2017. Project Leader from IPM: V. Tamužs.
- ERDF Project „Development of research infrastructure for research center of national importance for nanostructured and multifunctional materials, constructions and technologies (No. 2011/0041/2DP/2.1.1.3.1/11/IPIA/VIAA/004), 2012 – 2015. (Part of IPM).
- ERDF Project „Technologies for Acquisition of New Thermal Insulation Materials Polyurethanes from Renewable Natural Raw Material – Rapeseed Oil (No. PD1/ERAF/CFLA/05/APK/2.5.1/000037/019), 2007 – 2009. (Part of IPM).
- ERDF Project „ Road Barriers from Polymer Composite Material and Their Production Technology” (No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/091), 01/01/2011 – 31/12/2013. Project Leader: V. Leitlands.
- ERDF Project „ Research and Development of Fiber Concrete of Optimal Structure” (No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/073), 01/01/2011 – 31/12/2013. Project Leader: V. Tamužs.
- ERDF Project „ Development of Rigid Polyisocyanurate Biofoams Filled with Natural Materials”
(No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/053), 01/01/2011 – 31/12/2013. Project Leader: J. Andersons.
- ERDF Project „Development of production of artificial organic hair” (No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/170), 01.11/2010 – 31/10/2012. Project Leader: A. Arnautovs.
- ERDF Project „Development of new anchoring systems for pultruded composite materials and its application in structural elements with an increased load-carrying capacity” (No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/049), 01/10/210. – 30/09/2013. Project Leader:
A. Aniskevich.
- ERDF Project „Development of intelligent dielectrometry system and methodology for NDE of non-metallic materials” (No. 2010/0213/2DP/2.1.1.1.0/10/APIA/VIAA/017), 01/10/2010 – 30/09/2013. Leader: V. Shtrauss.
- ERDF Project „Support to international cooperation projects on the physicomechanical investigation of polymer composite materials” (No. 2010/0201/2DP/2.1.1.2.0/10/APIA/ VIAA/005), 01/10/2010. – 30/09/2013. Project Leader: A. Aniskevich.
- ESF Project „Involvement of human resources in complex research on modern composite materials”, (No. 2009/0209/1DP/1.1.1.2.0/09/APIA/VIAA/114),01/12//2009 – 30/11/2012. Project Leader: J. Jansons.
- EUREKA Project E!-4443 „Research on a new composition of concrete composite for industrial flooring and a new product development” (INNOCONCRITE”), 22/07/2007 – 30/06/2010. Project Leader: A. Tolks.
- EUREKA Project EU-1841 „ Bogie manufactured from composite materials (III stage)” (EUROBOGIE), 14/11/2007 – 31/07/2009. Project Leader: V. Tamužs.
- EUREKA Project E!-3446 „Quality Building Materials from Polymer Waste” (SANDPLAST), 01/08/2005 – 31/07/2007. Project Leader:
V. Leitlands.
- FP6 Integrated Project No. IST-2004-4354 „Flexible Displays”, 2004 – 2008. Project Leader: V. Tamužs.
- ES 6th. „Materials, Process and CAE Tools Developments for Pre-impregnated Carbon Binder Yarn Preform Composites” (AST5-CT-2006-030848 PreCarBi), 18/06/2007 – 01/11/2007. Project Leader: V. Tamužs.
- EC 6th „Materials, Process and CAE Tools Developments for Pre-impregnated Carbon Binder Yarn Preform Composites” (PreCarBi), Coordinator from Cranfield University (UK), 01/09/2006 – 01/09/2009. Project Leader: V. Tamužs.
- EC 6th „European Network for Composites Reinforcement” (EN-CORE), Coordinator from the University of Sheffield (UK), 29/11/2004 – 31/12/2008. Project Leader: V. Tamužs.
|
 |